|

Judge voids permits for Columbia River methanol plant, orders new environmental review

A judge on Monday voided permits needed for a massive methanol plant on the Columbia River in southwestern Washington, agreeing with conservation groups that the project needs a more thorough environmental review.

The U.S. Army Corps of Engineers had granted the permits for the construction of an export facility that is part of a $2 billion NW Innovation Works plant proposed in Kalama. The plant would take natural gas from Canada and convert it into methanol, which would be shipped to China to make olefins — compounds used in everything from fabrics and contact lenses to iPhones and medical equipment.

Similar Posts

Leave a Reply

Your email address will not be published. Required fields are marked *